0%

Regional freight operator

Northstack Logistics

A dispatch desk running on spreadsheets and phone calls.

340 hrs/mo

automated

-58%

dispatch errors

9 wks

to full cutover

We sat with the dispatchers.

Three days on the floor before a line of code. The spreadsheet had 14 tabs; four mattered.

One console, live data.

Driver status, load board, and customer ETAs in a single view. Every phone call it replaced was logged as a saved interruption.

Cutover in stages.

Two dispatchers for two weeks, then the whole desk. The spreadsheet stayed available and went untouched.

340 dispatcher-hours automated per month and dispatch errors down 58%. The night shift now runs with one person instead of two.

Meridian Dental